Glass canopy over the door

We manufactured 2 smaller glass awnings above the entrance to the administrative part of the building for the newly built STK and EK building in the industrial zone in Banská Bystrica. The project also includes a large glass shelter with a load-bearing steel structure.


When lifting and assembling the glass, we used a special lifting device that helped us place the roofs above the door without a mini crane and without installing scaffolding.

The specificity of the roof assembly was the attachment of the awning through the insulating sandwich panel of the building.

späť